Filter Pencarian SubSLS
Daftar Rincian SubSLS (Blok Sensus)
(9 / 9 SubSLS)
| No | Nama SLS | Wilayah | Petugas (PCL/PML/Korlap) | Status | FASIH % | Muatan % | Assignment FASIH | Progres Muatan | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Open | Draft | Submitted | Approved | Rejected | Target | Realisasi | Target | Usaha Baru | |||||||
| 1 |
Penajam
Salo Loang
|
Melebihi Target |
100.00%
114 / 114
|
131.03%
114 / 87
|
0 | 0 | 11 | 103 | 0 | 114 | 114 | 87 | +34 | ||
| 2 |
Penajam
Salo Loang
|
Melebihi Target |
98.08%
102 / 104
|
153.03%
101 / 66
|
0 | 0 | 5 | 97 | 0 | 104 | 101 | 66 | +43 | ||
| 3 |
Penajam
Salo Loang
|
Sedang Didata |
92.54%
124 / 134
|
75.61%
124 / 164
|
0 | 0 | 1 | 123 | 0 | 134 | 124 | 164 | +25 | ||
| 4 |
Penajam
Salo Loang
|
Sedang Didata |
100.00%
89 / 89
|
60.14%
89 / 148
|
0 | 0 | 0 | 89 | 0 | 89 | 89 | 148 | +9 | ||
| 5 |
Penajam
Salo Loang
|
Melebihi Target |
100.00%
212 / 212
|
107.25%
207 / 193
|
0 | 0 | 7 | 205 | 0 | 212 | 207 | 193 | +55 | ||
| 6 |
Penajam
Salo Loang
|
Sedang Didata |
82.28%
130 / 158
|
68.23%
131 / 192
|
0 | 4 | 64 | 63 | 3 | 158 | 131 | 192 | +38 | ||
| 7 |
Penajam
Salo Loang
|
Sedang Didata |
87.56%
169 / 193
|
85.00%
170 / 200
|
0 | 1 | 4 | 165 | 0 | 193 | 170 | 200 | +56 | ||
| 8 |
Penajam
Salo Loang
|
Sedang Didata |
97.31%
181 / 186
|
81.70%
183 / 224
|
0 | 2 | 11 | 170 | 0 | 186 | 183 | 224 | +31 | ||
| 9 |
Penajam
Salo Loang
|
Sedang Didata |
96.32%
157 / 163
|
58.89%
106 / 180
|
0 | 1 | 2 | 155 | 0 | 163 | 106 | 180 | +15 | ||
Rincian SubSLS
RT 002
6409030002000200
Kecamatan
Penajam
Desa/Kelurahan
Salo Loang
Pencacah (PCL)
Lulu Mu'Minah
Pengawas (PML)
Pipu Rini Astuti
Korlap
Aisyah
Status Progres SLS:
Sedang Didata
Assignment FASIH
92.54%
Open
0
Draft
0
Submit
1
Appr
123
Rejc
0
Progres Muatan
75.61%
Temuan Keberadaan Usaha
8
25
4
6
4
Temuan Keberadaan Keluarga
Ditemukan
45
Klg Baru
9
Tdk Ada
23
Analisis Kecepatan & Sisa Waktu
Kecepatan Saat Ini
2.00 dok/hari
Status Target
Off-Track
Hari berjalan pendataan: 62 hari (sejak 15 Juni 2026). Sisa hari menuju deadline (17 Agustus 2026): 2 hari.
Sisa beban kerja: 10 dokumen. Dengan kecepatan saat ini (2.00 dok/hari), beban kerja diprediksi akan selesai dalam waktu sekitar 5 hari.
Sisa beban kerja: 10 dokumen. Dengan kecepatan saat ini (2.00 dok/hari), beban kerja diprediksi akan selesai dalam waktu sekitar 5 hari.
Off-Track: Progres diprediksi terlambat/tidak selesai tepat waktu. Diperlukan peningkatan kecepatan kerja minimal menjadi 5.00 dok/hari agar selesai sesuai target pada 17 Agustus 2026.
Tren Progres Harian (FASIH)